-
Secondary school building on Torquato Tasso Strasse, Munich
A new primary and secondary school building with an underground car park and basement is being built on the grounds of the school at…
-
Railway overpass at Ernst Reuter Allee, Magdeburg, Germany
In 2015, the Civil Engineering division was awarded the contract for one of the largest railway infrastructure projects in the German state…
-
Spitz canning plant
Within nine months, the long-established Upper Austrian company Spitz built a state-of-the-art canning plant at their site at Attnang-Puchheim. The new compound will be built for…
-
NHT - Mitterweg, Innsbruck
In 2020, the property developer NEUE HEIMAT TIROL commissioned IAT GmbH with roof renovation works on two residential buildings at Mitterweg 157 and 159, near Innsbruck…
-
Neutal
Construction project Neutal – 7343 Neutal, Gewerbepark.
During the renovation works, the floor structure had to be demolished. For this purpose we were able to use our super suction…
-
New construction for Delacon Biotech
The new company location consists of an office building, laboratory and a production hall and warehouse.
A total roof area of approx. 4,200m² was sealed.
Flat…
-
HTL Dornbirn
In spring 2020, the chemistry department on the 2nd floor of the HTL Dornbirn was turned into a construction site. After months of work, the time has finally come – the new laboratories…
-
Taborland Shopping Center Steyr
The approximately 40-year-old Taborland shopping center was demolished and redesigned by Weiß Handels GmbH after it was acquired by the Rutter Immobilien Group.
The…
-
Albern Haven – San Cargo
Construction project Albern Haven – San Cargo office buildings
In July, 2020, the IAT GmbH Greenline, the department for suction and vacuuming technology, got the contract…
-
A11 Karawanken Tunnel
The existing Karawanken tunnel, a border tunnel between the Republic of Austria and Slovenia on the A11 Karawanken motorway, has a total length of 7.9km. 4,441m of the tunnel…